Full project support from preparation to commissioning of the facility.
We undertake a complex of duties of the technical customer — from preparation of project documentation to obtaining permits and commissioning of the facility. This allows the Customer to minimize risks, control deadlines and optimize costs.
Composition of the ACA's work:- Preparation and approval of the design task:
- Development of the design task, including technological sections, in accordance with the current norms;
- Approval of the assignment with permitting authorities, Chief Engineer of the project, Customer.
- Collection of initial permit documentation:
- Obtaining permits for design and construction;
- Preparation of a situational plan, geo-base, town-planning conclusion;
- Collection of technical conditions for connection of engineering networks (heat, water, electricity, etc.);
- Engineering-geological conclusions;
- Assessment of the condition of structures and networks in case of reconstruction or overhaul.
- Approval of project documentation. Depending on the type of object and type of work:
- District Prefecture / District Administration;
- GlavAPU / Chief Architect of the district;
- Federal Service for Surveillance, Moscow Committee for Architecture and Urban Development, Department of Nature Management;
- Utilities maintenance services, traffic police, Mosgortrans and other authorities.
- State expertise of the project:
- Preparation of a full package of documentation;
- Working with the design organization to eliminate remarks;
- Receipt of the final expert opinion;
- Registration of project documentation in the town-planning cadastre.
- Opening of the land-development warrant:
- Submission and support of documents to the Administrative and Technical Inspectorate;
- Control over compliance with the construction organization project and deadlines;
- Closing of the warrant upon completion of works.
- Commissioning of the facility:
- Coordination of all acceptance procedures;
- Obtaining authorization documentation;
- Preparing the facility for commissioning.
- Cost reduction due to competent support at all stages;
- Transparency and control of design and construction works fulfillment;
- Confidence in compliance of the object with all technical and regulatory requirements;
- Timely receipt of all permits and approvals;
- Reduction of terms of commissioning of the facility.